NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
GMVS Poma
Sugarbush Resort
Vermont
Status Standing  
Type Platter  
Brand Hall-Poma  
Install Season 1982-83  
New Install?  
Ancestors
Cost   
Install Length 1,940 feet  
Install Vertical 572 feet 
Final Season Standing  
Descendants
Notes Possibly relocated T-Bar and Tranquilizer Poma Possibly installed in 1982  
Load Previous 20 Photos

The top terminal (March 2019)
The top terminal (March 2019)

The base terminal (March 2019)
The base terminal (March 2019)

The lift line (March 2019)
The lift line (March 2019)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
Killington and Pico almost connected
Killington and Pico almost connected
The only Skimobile in New England history
The only Skimobile in New England history
Regaining its Magic
Regaining its Magic
A lost ski area with a gondola!
A lost ski area with a gondola!
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.