CT
|
MA
|
ME
|
NH
|
RI
|
VT
New England Ski Lift Database
Chair 1
Suicide Six
Vermont
Status
Standing
Type
Chairlift - Quad - Fixed
Brand
Leitner-Poma
Install Season
2016-17
New Install?
New
Ancestors
Cost
$1,500,000 Woodstock Inn and Resort
Install Length
1,946 feet
Install Vertical
610 feet
Final Season Standing
Descendants
Notes
250 HP, 450 FPM.
Bottom terminal ground work (August 2016)
The bottom terminal (October 2016)
The bottom terminal (October 2016)
A footing (October 2016)
Parts staged for installation (October 2016)
Tower installation (November 2016)
Tower installation (November 2016)
Tower installation (November 2016)
The bottom terminal (November 2016)
The bottom terminal (November 2016)
The bottom terminal (November 2016)
The lift line (December 2016)
The top terminal (December 2016)
The lift line (December 2016)
The top terminal (2017)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
Load More Photos
Also on NewEnglandSkiHistory.com...
A monorail served ski area?
Killington and Pico almost connected
A classic trail cut by the Civilian Conservation Corps
Before the resort, there was the Nose Dive
A lost ski area with a gondola!
West Bowl at Jay Peak?
CCC Trails
Cancelled Ski Areas
Expansions
Lifts
Management
Maps
News
Then and Now
Timelines
Topics
In The Press
Links
Site Map
What's New
Feedback
Copyright 2002-2019, All Rights Reserved.