East Basin at Loon Mountain Resort
After opening with novice and intermediate terrain served by a top to bottom gondola and two smaller double chairs, one thing Loon lacked was legitimate expert terrain.
In 1968 a new 3,690 foot long Hall double chairlift was installed in the East Basin area, serving 1,230 vertical feet of expert terrain, including challenging trails such as Triple Trouble and Big Dipper. The chairlift would later be upgraded with Doppelmayr and CTEC equipment and eventually made somewhat redundant with the installation of the North Peak triple a decade and a half later.
 Installation of the East Basin Double in 1968
 The East Basin in 1970
 The East Basin Double in 2007
 The East Basin Double in 2013
 The East Basin in 2009
Last updated: March 27, 2014
|