NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Snowflake Lift
Bolton Valley
Vermont
Status Standing  
Type Chairlift - Double - Fixed  
Brand Hall  
Install Season 1966-67  
New Install? New  
Ancestors
Cost   
Install Length 1,230 feet  
Install Vertical 250 feet 
Final Season Standing  
Descendants
Notes  

Snowflake Double in 2002
Snowflake Double in 2002

Snowflake Double in 2002
Snowflake Double in 2002

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

The bottom terminal (2014)
The bottom terminal (2014)

Test chairs (2014)
Test chairs (2014)

The line (2014)
The line (2014)

The line (2014)
The line (2014)

The line (2014)
The line (2014)

The line (2014)
The line (2014)

The line (2014)
The line (2014)

The line (2014)
The line (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The top terminal (2014)
The top terminal (2014)

The lift line (2015)
The lift line (2015)

The lift line (2015)
The lift line (2015)



Also on NewEnglandSkiHistory.com...
A monorail served ski area?
A monorail served ski area?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
The Puzzle of Evergreen Valley
The Puzzle of Evergreen Valley
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.