NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Tail Spin
Campton Mountain Ski Area
New Hampshire
Status Standing  
Type Chairlift - Double - Fixed  
Brand Stadeli  
Install Season 1969-70  
New Install? New  
Ancestors
Cost   
Install Length 1,481 feet  
Install Vertical 313 feet 
Final Season Standing  
Descendants
Notes  
Load Previous 20 Photos

The base terminal (December 2016)
The base terminal (December 2016)

The lift line (December 2017)
The lift line (December 2017)

The base terminal (March 2018)
The base terminal (March 2018)

The base terminal (March 2018)
The base terminal (March 2018)

A grip (March 2018)
A grip (March 2018)

The lift line (March 2018)
The lift line (March 2018)

The lift line (March 2018)
The lift line (March 2018)

The lift line (March 2018)
The lift line (March 2018)

The lift line (March 2018)
The lift line (March 2018)

The top terminal (March 2018)
The top terminal (March 2018)

Load Previous 20 Photos



Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
Shawnee Peak's Pleasant Past
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
From a small area to a mega resort
From a small area to a mega resort
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.