NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
A Chair
Bretton Woods
New Hampshire
Status Removed  
Type Chairlift - Double - Fixed  
Brand Heron-Poma  
Install Season 1973-74  
New Install? New  
Ancestors
Cost   
Install Length 5,120 feet  
Install Vertical 1,057 feet 
Final Season Standing 1999-00  
Descendants
Notes Sold to SkyTrans.  



Also on NewEnglandSkiHistory.com...
The largest ski resort in New England.  Almost.
The largest ski resort in New England. Almost.
Killington and Pico almost connected
Killington and Pico almost connected
Once a large ski area, now defunct
Once a large ski area, now defunct
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.