NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Andy's Lift
Brodie Mountain Ski Area
Massachusetts
Status Standing  
Type Chairlift - Double - Fixed  
Brand Stadeli  
Install Season 1977-78  
New Install? New  
Ancestors
Cost $350,000  Berkshire Eagle
Install Length 4,500 feet  
Install Vertical 950 feet 
Final Season Standing  
Descendants
Notes Named after Jim Kelly's son Andy.  

Construction of the lift (October 1977)
Construction of the lift (October 1977)

Jim Kelly and the control panel (November 1977)
Jim Kelly and the control panel (November 1977)

Andy's Lift in 2002
Andy's Lift in 2002

Andy's Lift in 2002
Andy's Lift in 2002

Andy's Lift in 2002
Andy's Lift in 2002

Andy's Lift in 2002
Andy's Lift in 2002

The top of Andy's Lift in 2005
The top of Andy's Lift in 2005

The top of Andy's Lift in 2005
The top of Andy's Lift in 2005

The base terminal (April 2015)
The base terminal (April 2015)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
A classic trail cut by the Civilian Conservation Corps
A classic trail cut by the Civilian Conservation Corps
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail?  Almost.
A 5,000 acre resort with a tram and monorail? Almost.
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.