NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Nor'easter Triple
Wachusett Mountain Ski Area
Massachusetts
Status Removed  
Type Chairlift - Triple - Fixed  
Brand Doppelmayr  
Install Season 1983-84  
New Install?  
Ancestors Nor'easter Double, Wachusett, MA
Cost   
Install Length 3,750 feet  
Install Vertical 600 feet 
Final Season Standing 1999-00  
Descendants Monadnock Triple, Wachusett, MA
Notes Nor'Easter Double upgraded to triple for 1983-84 season. 200 HP solid state variable speed drive with 50% downhill capacity.  

The Nor'Easter Triple (1984)
The Nor'Easter Triple (1984)



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
From top to bottom - American Skiing Company
From top to bottom - American Skiing Company
Taking the New England ski industry by storm - fan guns
Taking the New England ski industry by storm - fan guns
Before the resort, there was the Nose Dive
Before the resort, there was the Nose Dive
The man behind Mount Snow and Mohawk
The man behind Mount Snow and Mohawk
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.