Connecticut
Maine
Massachusetts
New Hampshire
Rhode Island
Vermont
New England Ski Lift Database
Pinnacle Double
Granite Gorge
New Hampshire
Status
Standing
Type
Chairlift - Double - Fixed
Brand
Borvig
Install Season
2005-06
New Install?
Ancestors
Devil's Elbow, ON
Cost
Install Length
1,500 feet
Install Vertical
Final Season Standing
Descendants
Notes
Installed by helicopter in October 2005.
The Pinnacle Double prior to opening in 2005
Installation of the Pinnacle Double (October 2005)
Installation of the Pinnacle Double (October 2005)
Installation of the Pinnacle Double (October 2005)
Installation of the Pinnacle Double (October 2005)
The Pinnacle Double bottom terminal in 2013
The Pinnacle Double bottom terminal in 2013
The Pinnacle Double bottom terminal in 2013
The Pinnacle Double top terminal in 2013
The Pinnacle Double midstation in 2013
The Pinnacle Double in 2013
The Pinnacle Double in 2013
The Pinnacle Double in 2013
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
The base terminal (2018)
Load More Photos
Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
Killington and Pico almost connected
A massive ski area once proposed in Southern Vermont...
Regaining its Magic
Beer man and owner of one of the largest ski area chains in history
West Bowl at Jay Peak?
Topics
Links
What's New
Feedback
Copyright 2002-2023, All Rights Reserved.