New England Ski Lift Database
Double
Camden Snow Bowl
Maine
Status
Standing
Type
Chairlift - Double - Fixed
Brand
Hall
Install Season
2015-16
New Install?
Ancestors
Chair, Camden Snow Bowl, ME
Cost
Install Length
1,123 feet
Install Vertical
228 feet
Final Season Standing
Descendants
Notes
44 chairs, 401 feet per minute, uphill capacity 900, 75 HP drive. Partially installed in 2014. Lift opened on January 1, 2016.
Pouring tower footings (October 2014)
The bottom terminal awaiting installation (November 2014)
The bottom terminal awaiting installation (November 2014)
The bottom terminal prior to haul rope splicing (2015)
The incomplete bottom terminal (2015)
The incomplete bottom terminal (2015)
The incomplete bottom terminal (2015)
The incomplete bottom terminal (2015)
The lift line (2015)
The lift line (2015)
The lift line (2015)
The top unload (2015)
The top unload (2015)
The future top terminal (2015)
The future top terminal (right) (2015)
Load testing (December 2015)
Load testing (December 2015)
Load testing (December 2015)
Load testing (December 2015)
Load testing (December 2015)
Load More Photos
Also on NewEnglandSkiHistory.com...
A monorail served ski area?
Killington and Pico almost connected
The only Skimobile in New England history
Before the resort, there was the Nose Dive
The man behind Mount Snow and Mohawk
A 5,000 acre resort with a tram and monorail? Almost.
CCC Trails
Cancelled Ski Areas
Expansions
Lifts
Management
Maps
News
Then and Now
Timelines
Topics
In The Press
Links
Site Map
What's New
Feedback
Copyright 2002-2019, All Rights Reserved.