NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Holts Double
Dartmouth Skiway
New Hampshire
Status Standing  
Type Chairlift - Double - Fixed  
Brand Hall-Doppelmayr-CTEC  
Install Season 1977-78  
New Install?  
Ancestors Dutchess, NY
Cost   
Install Length 3,500 feet  
Install Vertical  
Final Season Standing  
Descendants
Notes Likely originally a 1971 install (3,034 feet long, 879 feet vertical) at Dutchess, NY. Rebuilt by Doppelmayr-CTEC for 2005-06 season  

Holts Double in 2004
Holts Double in 2004

Holts Double in 2004
Holts Double in 2004

Holts Double in 2011
Holts Double in 2011

Holts Double in 2011
Holts Double in 2011

Holts Double in 2013
Holts Double in 2013

Holts Double in 2013
Holts Double in 2013

Holts Double in 2013
Holts Double in 2013

Holts Double in 2013
Holts Double in 2013

Holts Double in 2013
Holts Double in 2013

The lift line (2015)
The lift line (2015)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)

The lift line (2016)
The lift line (2016)



Also on NewEnglandSkiHistory.com...
The Hermitage Club at Haystack Mountain?
The Hermitage Club at Haystack Mountain?
Killington and Pico almost connected
Killington and Pico almost connected
A massive ski area once proposed in Southern Vermont...
A massive ski area once proposed in Southern Vermont...
Once one of the busiest areas in New England...now idle
Once one of the busiest areas in New England...now idle
Beer man and owner of one of the largest ski area chains in history
Beer man and owner of one of the largest ski area chains in history
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.