NewEnglandSkiHistory.com
CT
|
MA
|
ME
|
NH
|
RI
|
VT
SkiNewEngland.net
 
New England Ski Lift Database
Sunnyside Triple
Ski Sundown
Connecticut
Status Standing  
Type Chairlift - Triple - Fixed  
Brand Borvig  
Install Season 1980-81  
New Install? New  
Ancestors
Cost   
Install Length 562 feet  
Install Vertical 117 feet 
Final Season Standing  
Descendants
Notes  

The Sunnyside Triple in 2004
The Sunnyside Triple in 2004

The Sunnyside Triple in 2004
The Sunnyside Triple in 2004



Also on NewEnglandSkiHistory.com...
Big expansion plans at Waterville?
Big expansion plans at Waterville?
The only high speed quad area in New England to close
The only high speed quad area in New England to close
The only Skimobile in New England history
The only Skimobile in New England history
A ski area built on Massachusetts' highest peak that never opened...
A ski area built on Massachusetts' highest peak that never opened...
Berkshire Snow Basin, Swift River, and the Ninja Turtles
Berkshire Snow Basin, Swift River, and the Ninja Turtles
An area partially constructed near Manchester, NH?
An area partially constructed near Manchester, NH?
   CCC Trails    Cancelled Ski Areas    Expansions    Lifts    Management    Maps    News    Then and Now    Timelines    Topics    In The Press    Links    Site Map    What's New    Feedback

Copyright 2002-2019, All Rights Reserved.