CT
|
MA
|
ME
|
NH
|
RI
|
VT
New England Ski Lift Database
Aerial Tram
Jay Peak Resort
Vermont
Status
Standing
Type
Aerial Tramway
Brand
Von Roll
Install Season
1966-67
New Install?
New
Ancestors
Cost
$2,000,000 Granby Leader-Mail
Install Length
7,776 feet
Install Vertical
1,953 feet
Final Season Standing
Descendants
Notes
Hangers and cabins replaced for 2000-01 season. New control installed for 2005-06 season.
The tram circa the late 1960s or 1970s
Aerial Tram construction circa 1966
Aerial Tram construction circa 1966
The Aerial Tram circa the early 1990s
The Aerial Tram in 2007
An old Aerial Tram car (foreground) and a current Aerial Tram car (background left) in 2013
The Aerial Tram in 2013
The Aerial Tram in 2013
The Aerial Tram in 2013
The Aerial Tram in 2013
A retired tram cabin (2015)
The base station (2015)
The upper lift line (2015)
An old tram car (2017)
An old tram car (2017)
The base terminal (2017)
The base terminal (2017)
The base terminal (2017)
The lift line (2017)
The lift line (2017)
Load More Photos
Also on NewEnglandSkiHistory.com...
Shawnee Peak's Pleasant Past
A grand hotel in northern New Hampshire
Once a large ski area, now defunct
A ski area built on Massachusetts' highest peak that never opened...
Will Tenney's lifts spin again?
A 5,000 acre resort with a tram and monorail? Almost.
CCC Trails
Cancelled Ski Areas
Expansions
Lifts
Management
Maps
News
Then and Now
Timelines
Topics
In The Press
Links
Site Map
What's New
Feedback
Copyright 2002-2019, All Rights Reserved.